Waste Management

Considerable developments have occurred in the regulation of landfills in the UK in recent years. In April 2008 the Environmental Permitting (EP) Regulations were introduced resulting in the consolidation of the Waste Management Licencing and Pollution Prevention and Control (PPC) permiting regimes. The earlier PPC Regulations brought about a new emphasis on self regulation with operators being more responsible for the environmental performance of their sites. The Landfill Regulations also saw an end to co-disposal, introduced a need to pre-treat waste and specified engineering requirements for different classifications of landfill.

Background

Hafren Water provides support to clients in both the Planning Application and permitting stages of landfill development and operation. Assessment of all water issues associated with landfilling can be undertaken including the development of a conceptual understanding of the setting of a site and risk assessment. Quantitative risk assessments are undertaken using industry standard software. Extensive experience exists within the company of undertaking both the technical input and also providing support to the client during negotiations with the Environment Agency.

Services

Hydrogeological services are regularly provided by Hafren Water in relation to obtaining planning permission or Environmental Permits (previously PPC permits or WML) for landfill sites with varying waste streams from inert to hazardous.

  • Environmental Impact Assessments
  • Hydrogeological Risk Assessment
  • Setting of control and trigger levels
  • Landfill completion reports for closure and surrender
  • Compliance monitoring and reporting
  • Landfill rehabilitation
  • Landfill site investigations

Hafren Water provides a full PPC Permit Application Service and regularly works closely with associates to undertake the majority of the necessary risk assessments; hydrogeological, landfill stability and landfill gas.

Negotiation with the Environment Agency at pre and post application stages together with completion of the Permit application forms, production of conceptual model figures and input to landfill design is undertaken to provide a complete Permit Application package for both new and existing landfills.

Close liaison with Clients and detailed understanding of the EP/PPC process and requirements of the Environment Agency help ensure satisfactory outcomes to applications.

A selection of relevant case studies can be viewed here

Clients

Hafren Water has recently completed waste management related work for (amongst others):

  • Tarmac Recycling Ltd
  • Colliers Industrial Waste
  • Middleton Aggregates Ltd
  • Donarbon
  • C-Cycle Recycling
  • Bullimores Sand and Gravel Ltd
  • Edwards Waste Management
Waste Management

For further information regarding mineral extraction work please contact Heather Macleod on 01743 355770 or email

Web Design Shropshire by Interactive Information Services Limited